Setting unbalanced load limitation
The unbalanced load monitoring between phases L1-L3 can be activated. If the unbalanced load between the phases is greater than 4.6 kVA, the charging power is reduced. In some countries, activation of this function is mandatory.
Configure the setting as desired.
Configurable functions:
Bank | DIP switch | Function | |
---|---|---|---|
1 | 2 | OFF | Unbalanced load limitation deactivated |
ON | Unbalanced load limitation activated. |