Setting unbalanced load limitation

The unbalanced load monitoring between phases L1-L3 can be activated. If the unbalanced load between the phases is greater than 4.6 kVA, the charging power is reduced. In some countries, activation of this function is mandatory.

Configure the setting as desired.

Configurable functions:

Bank

DIP switch

Function

1

2

OFF

Unbalanced load limitation deactivated

ON

Unbalanced load limitation activated.