Configuring power curtailment
If power curtailment is to be configured in a multiple-inverter connection, it must be set up in the KOSTAL Smart Energy Meter.
Configuration of the maximum permitted feed-in capacity in the KOSTAL Smart Energy Meter
- All inverters must be set up in the KOSTAL Smart Energy Meter via an IP address.
- Call up the Plant overview/settings menu.
- Click on the gear wheel (Settings).
- Enable Activate power limitation switch.
- Enter the feed-in limit (e.g. 70 %) of the generator output in watts or use the calculator.
- Click on Save to adopt the settings.
INFO
In conjunction with a battery storage system and additional inverters, power curtailment is activated in the KOSTAL Smart Energy Meter. If there is only one PLENTICORE in the system, power curtailment is configured in the inverter.