Add the ENECTOR G1 wallbox
The ENECTOR G1 wallbox is connected to the KSEM G2 via the device manager and is then displayed under the ‘Wallbox’ menu. An additional activation code is required for setup in the KSEM G2; you can purchase this from the KOSTAL webshop or via a wholesaler.
The ENECTOR G1 is connected to the KSEM via an RS485 interface.
INFO

Note that the RS485 interface to which the wallbox is connected has to be released in the Modbus settings first.
To control the wallbox via the KOSTAL Smart Energy Meter G2 (KSEM G2), it must be added in the KSEM G2’s Device Manager.

- Open the KSEM G2 web server.
- Select the menu item System Control > Device Manager and then Add.
- Under ‘Add manually’, select ‘Wallbox’ and then choose the device type ‘KOSTAL ENECTOR AC’ for the ENECTOR G1. This device type will only appear once the activation code ‘KOSTAL Wallbox ENECTOR G1 ’ has been activated in the KSEM G2. Confirm your selection by clicking ‘Next’.
- On the next screen, complete or check the following fields
- Name: Enter a name for the wallbox.
- Serial interface: Select the interface via which the ENECTOR G1 is connected to the KSEM. By default, this should be RS485 B.
- Slave address: 50 – This must not be changed. After installation, the wallbox is automatically assigned a new address (100) in the system.
- Wallbox phase rotation: The selection of connected phases must match the phases actually connected to the device.
Confirm your entries by clicking OK. - In the ‘Phase Switching’ window, select the number of phases to which the wallbox is connected.
- Standard: The wallbox has been connected to 3 phases.
- Single-phase: The wallbox has been connected to just one phase.
Confirm your entries by clicking OK. - The wallbox is added to the system. You can configure the wallbox further via ‘Edit ’.
Check / change phase sequence
INFO

Phase imbalance / phase sequence of the wallbox
If there are several wallboxes or high-power consumers on the domestic network, it may be necessary to adjust the phase sequence of the wallbox to avoid an unbalanced load, in accordance with applicable guidelines (in Germany, this is 4.6 kW).
By default, the phase sequence is set to L1/L2/L3 in the wallbox and does not need to be changed if there is only one wallbox on the domestic network.
If the phase sequence needs to be changed to avoid an unbalanced load, the phase sequence can be adjusted under the menu: System Settings > Device Manager > Settings > Wallbox > Edit > Phase Rotation of the Wallbox. The selected phase sequence must correspond to the physical connection of the phases in the wallbox.