Menu – Smart Grid
The Smart Grid function allows EEBus-compatible devices located on the local network to be connected or paired with the KOSTAL Smart Energy Meter. The KOSTAL Smart Energy Meter can receive data from EEBus-compatible smart meter gateways and control the connected loads.
The following use cases can be implemented using the KOSTAL Smart Energy Meter.
|
Parameter |
Explanation |
|---|---|
Limitation of Power Consumption (LPC) | Limitation of power drawn from the grid This usage scenario can be used to allow external parties to control the power drawn from the grid (e.g. a power limitation for the ENECTOR or in order to charge a connected battery from the grid). Note: The battery can only be controlled by means of LPC with the inverter G3 SW version 3.6.0. |
Limitation of Power Production (LPP) | Limitation of power generation This usage scenario can be used to allow external parties to control the feed-in (e.g. of a KOSTAL inverter). |
Monitoring of Grid Connection Point (MGCP) | Provision of grid connection data. |
Monitoring of Power Consumption (MPC) | Reading consumption data from externally connected EEBus devices. |