Connecting ripple control receiver

Ask your local energy supplier or your installer which connection is necessary for you.

Controlling the inverter via CEI control signals

For Italy, a ripple control receiver can be connected to terminal X403. After installation and initial commissioning of the inverter, the switchable shutdown limits must still be configured in the Webserver under Service menu > Grid and system protection. You can obtain the required information from your local energy supplier.

Controlling the inverter via trip control signals

A ripple control receiver can be connected to terminal X401 to control the inverter via an external trip control signal.