System overview
PLENTICORE plus G2 with 3 PV inputs

|
1 |
Inverter |
|
2 |
PV generators (number depends on the type) |
|
3 |
Line circuit breaker for inverter |
|
4 |
Digital energy meter (Modbus RTU) |
|
5 |
Main fuse for building |
|
6 |
Feed-in procurement meter or smart meter (not in all countries) |
|
7 |
Public grid |
|
8 |
Line circuit breaker for energy consumers |
|
9 |
Energy consumers |
|
10 |
Communication link for inverter |
PLENTICORE plus G2 with 2 PV inputs and 1 DC battery connection

|
1 |
Inverter |
|
2 |
PV generators (number depends on the type) |
|
3 |
Line circuit breaker for inverter |
|
4 |
Digital energy meter (Modbus RTU) |
|
5 |
Main fuse for building |
|
6 |
Procurement and feed meter or smart meter (not in all countries) |
|
7 |
Public grid |
|
8 |
Line circuit breaker for energy consumers |
|
9 |
Energy consumers |
|
10 |
Communication link for inverter |
|
11 |
Connection for battery system (available as option after activation) |
|
12 |
Battery Management System (BMS) communication link via CAN or RS485 (depending on battery system) |
PLENTICORE plus G2 with additional AC energy supplier

|
1 |
Inverter |
|
2 |
PV generators (number depends on the type) |
|
3 |
Line circuit breaker for inverter |
|
4 |
Digital energy meter (Modbus RTU) |
|
5 |
Main fuse for building |
|
6 |
Procurement and feed meter or smart meter (not in all countries) |
|
7 |
Public grid |
|
8 |
Line circuit breaker for power consumption |
|
9 |
Power consumption |
|
10 |
Communication link for inverter |
|
11 |
Connection for battery system (available as option after activation) |
|
12 |
Battery Management System (BMS) communication link via CAN or RS485 (depending on battery system) |
|
13 |
Feed meter for AC power source |
|
14 |
Line circuit breaker for AC power source |
|
15 |
AC power source, e.g. CHP unit, or other generation plants, such as PV inverter (the energy from the AC power source can be temporarily stored in the battery) |