"Service – general" menu

 

Level 1

Level 2

Level 3

Service menu

Energy management 5

Select energy meter fitted, the installation position and the feed-in capacity limitation (e.g. to 70 %).

Store AC energy sources located in the same house grid in the connected battery.

Receive control signals from a ripple control receiver.

Generator settings

Activate shadow management per MPP input or use of external module controls.

Battery settings

Select battery type, battery control, battery use from a certain power level, activate intelligent battery control and time-controlled battery use.

External hardware settings

Set compatibility with residual current devices/RCD type A circuit breakers.

Digital inputs 5

Set function of digital inputs (e.g. operating mode of ripple control receiver and activation of forwarding of control signals or for external battery control).

CEI inputs

Activate the CEI input (terminal X403).

The switchable shutdown limits must be configured under "Grid and system protection".

Switched output

Set the functions of the 4 switched outputs (e.g. for load control, for a heat pump with SG Ready label, events)

Extra option

Release extra option via activation code (e.g. battery use on DC3)