Connecting CEI control signals for Italy
For Italy, the ripple control receiver is connected as follows.
1 |
Smart Communication Board |
2 |
Terminal |
3 |
Sealing ring |
4 |
Union nut |
5 |
Control line |
6 |
Ripple control receiver |
IMPORTANT INFORMATION
For Italy (standard CEI0-21), there must be no voltage applied to terminal X403 (VDD).
Connection to an external voltage source and a changeover switch to GND is mandatory here.