System overview

PLENTICORE plus G2 with 3 PV inputs

1

Inverter

2

PV generators (number depends on the type)

3

Line circuit breaker for inverter

4

Digital energy meter (Modbus RTU)
Home consumption (position 1) or grid connection (position 2). Position 2 should be prioritised.

5

Main fuse for building

6

Feed-in procurement meter or smart meter (not in all countries)

7

Public grid

8

Line circuit breaker for energy consumers

9

Energy consumers

10

Communication link for inverter

PLENTICORE plus G2 with 2 PV inputs and 1 DC battery connection

1

Inverter

2

PV generators (number depends on the type)

3

Line circuit breaker for inverter

4

Digital energy meter (Modbus RTU)
Home consumption (position 1) or grid connection (position 2). Position 2 should be prioritised.

5

Main fuse for building

6

Procurement and feed meter or smart meter (not in all countries)

7

Public grid

8

Line circuit breaker for energy consumers

9

Energy consumers

10

Communication link for inverter

11

Connection for battery system (available as option after activation)

12

Battery Management System (BMS) communication link via CAN or RS485 (depending on battery system)

PLENTICORE plus G2 with additional AC energy supplier

1

Inverter

2

PV generators (number depends on the type)

3

Line circuit breaker for inverter

4

Digital energy meter (Modbus RTU)

5

Main fuse for building

6

Procurement and feed meter or smart meter (not in all countries)

7

Public grid

8

Line circuit breaker for power consumption

9

Power consumption

10

Communication link for inverter

11

Connection for battery system (available as option after activation)

12

Battery Management System (BMS) communication link via CAN or RS485 (depending on battery system)

13

Feed meter for AC power source

14

Line circuit breaker for AC power source

15

AC power source, e.g. CHP unit, or other generation plants, such as PV inverter (the energy from the AC power source can be temporarily stored in the battery)