Limitation of the PV feed-in capacity
If the energy supply company stipulates a limitation on PV power for your PV system and you are not able or do not want to implement active power control with a ripple control receiver, then the feed-in capacity should be reduced to the value stipulated by the energy supply company (e.g. 70%).
IMPORTANT INFORMATION
Incorrect settings due to lack of expertise.
The system operator is responsible for correctly setting the active power limitation. Your grid operator will provide details of the permissible active power for your system.
We recommend that the installer configures all the settings.
Ask your energy supply company what power limitation applies to you.
The power limitation can be set by going to the inverter menu Settings/information > Service menu > Energy management > Input of max. feed-in capacity or using the Webserver by going to Service menu > Energy management > Limit to [W].
INFO
In some applications, a compatible energy meter may be seen as an attractively priced alternative to the ripple control receiver. Here the feed-in may well be limited by the energy supply company, but the inverter controls the flow of energy (self-consumption in house grid and feed-in to the public grid) in such a way that the self-produced energy is not lost or loss is kept to an absolute minimum.
Dynamic active power control can be activated in the inverter to this end. Active power control