Menu "Service – grid parameterization"
|
Level 1 |
Level 2 |
Level 3 |
---|---|---|---|
|
Service menu |
Parameterization report |
Overview of parameters set in the inverter |
Reactive power settings 6 |
Reactive power configuration | ||
Start-up ramp 6 |
Configuration of start-up ramp if there is a start-up or grid error | ||
LVRT/HVRT 6 |
LVRT/HVRT | ||
P(f) 6 |
Configuration of power reduction in the case of overfrequency P(f) | ||
P(U) 6 |
Configuration of power reduction in the case of overvoltage P(U)1 | ||
Settling time 6 |
Configuration of the settling time. Setting the settling time with external control, reactive power or active power by means of ripple control receiver or Modbus | ||
Grid and system protection 6 |
Grid and system protection. Configuration of the grid and system protection: Voltage L-N, frequency, start-up voltage, start-up frequency, start-up waiting time for start, start-up waiting time for grid error | ||
Grid and system protection self-test |
Self-test for grid and system protection Performs a self-test and outputs the result for it |