Grid connection

Selection of the connected energy meter on the inverter and the feed-in limitation to the public grid.

INFO

Info

The settings in this menu can only be configured after logging in as the installer.

INFO

Info

You will find a list of approved energy meters and their purpose in the download area for the product on our website at https://www.kostal-solar-electric.com.

Parameter

Explanation

Energy meter

Selection of connected energy meter.

Sensor position

Select the position of the energy meter fitted in the building services.

Grid connection point = position 2

Home consumption = position 1

Energy meter connection

Limitation of active power to [W]

(configurable without service code)

Set the max. feed-in capacity. Requirements relating to this are generally specified by the energy supply company (e.g. a limitation to 60 %). The inverter's max. power serves as the default. Use the calculator to easily calculate the reduction.

NOTE! Incorrect settings possible due to lack of expertise. The plant owner is responsible for correctly setting the active power limitation. Your grid operator will provide details of the permissible active power for your system. We recommend that the installer configures all the settings.

Enable reception of broadcast control signals

If a ripple control receiver is connected to the digital inputs of another inverter, the signals for active and reactive power control can be distributed to all inverters in the local area network (LAN) via UDP broadcast. Similarly, a local energy manager can generate signals for active and reactive power control in the local network.

Enabled: The inverter is controlled by a ripple control receiver connected to another inverter.

Deactivated (default): The signals are not evaluated. The inverter is not controlled by a ripple control receiver connected to another inverter.